Projects 3D-Deformation Surveying

Ankerwände AW1-AW14; S6 - Semmering Schnellstraße
ARGE S6-Ankerwände; KAIM - PROINJECT
3D-monitoring of several anchor walls along S6
since 2015
Brenner Basistunnel, Geodätische Höhenüberwachung; Tulfes-Pfons
Monitoring of explicit objects concerning lowering and /or tilting effects
since 2015
Ankerwand, B7-A5
ARGE Erd- und Straßenbau, PPP Ostregion
3D-deformation surveys at ca. 10 control sections
since 2012
Lainzer Tunnel - Baulos LT33, Vienna
ÖBB
Geotechnical surveying
2007-2010